Structural-steel fire protection

Steel columns, beams, frames and trusses require a system based on the environment, fire design, member geometry and primer compatibility. Interior, exterior, waterside and humid conditions need separate review.

PMA钢结构中庭PMA钢结构中庭
PMA钢结构中庭

Three selection branches

PMA is an interior intumescent option; PMS is an exterior intumescent option; HCF is a mineral non-intumescent spray-applied option. These are alternatives selected for each member, not three layers to apply together. A project may use different materials on different elements.

Preparation and construction

Review corrosion, grease, existing primers, adhesion, equipment, thickness and recoat conditions. The required fire duration must correspond to the tested member and system.

Engineering applications

Project applications include Fangchenggang and Yangjiang conventional-island buildings, Ping An Finance Centre, Canton Tower, Guangzhou Metro elevated stations, CCTV headquarters, Pazhou exhibition halls, Baiyun Airport and Castle Peak Power Station.