Fangchenggang Nuclear Power Station Phase I
Fangchenggang Nuclear Power Station Phase I uses PMA, PMS for structural-steel fire protection. Materials and thicknesses are selected for the respective members and project conditions.
Project information
| Field | Details |
|---|---|
| Project | Fangchenggang Nuclear Power Station Phase I |
| Materials | PMA, PMS |
| Project area | 150,000 m² |
| Fire-design requirements | 1.0–2.5 h |
Application scope
Protective-coating supply and application for steelwork in conventional-island turbine halls and pump houses.
Specify for a comparable project
Confirm member geometry, corrosion primer, dry-film thickness, exposure and acceptance criteria. Project fire durations are not universal standalone coating ratings.
