Guangzhou Metro elevated stations

Guangzhou Metro elevated stations uses PMA, PMS for structural-steel fire protection. Materials and thicknesses are selected for the respective members and project conditions.

广州地铁车站外观广州地铁车站外观
广州地铁车站外观

Project information

FieldDetails
ProjectGuangzhou Metro elevated stations
MaterialsPMA, PMS
Project area80,000 m²
Fire-design requirements1.5 h, 2.0 h

Application scope

Elevated stations on Guangzhou Metro Lines 4 and 5.

Specify for a comparable project

Confirm member geometry, corrosion primer, dry-film thickness, exposure and acceptance criteria. Project fire durations are not universal standalone coating ratings.

Project view

Project viewProject view

Project view

气候行动产品目录 / Climate Action catalogue