Canton Tower, Guangzhou
Canton Tower, Guangzhou uses PMS for structural-steel fire protection. Materials and thicknesses are selected for the respective members and project conditions.
Project information
| Field | Details |
|---|---|
| Project | Canton Tower, Guangzhou |
| Materials | PMS |
| Fire-design requirements | 2.0 h |
Specify for a comparable project
Confirm member geometry, corrosion primer, dry-film thickness, exposure and acceptance criteria. Project fire durations are not universal standalone coating ratings.
