Canton Tower, Guangzhou

Canton Tower, Guangzhou uses PMS for structural-steel fire protection. Materials and thicknesses are selected for the respective members and project conditions.

广州塔广州塔
广州塔

Project information

FieldDetails
ProjectCanton Tower, Guangzhou
MaterialsPMS
Fire-design requirements2.0 h

Specify for a comparable project

Confirm member geometry, corrosion primer, dry-film thickness, exposure and acceptance criteria. Project fire durations are not universal standalone coating ratings.

气候行动产品目录 / Climate Action catalogue