Castle Peak Power Station, Hong Kong

Castle Peak Power Station, Hong Kong uses PMA for structural-steel fire protection. Materials and thicknesses are selected for the respective members and project conditions.

香港青山电厂香港青山电厂
香港青山电厂

Project information

FieldDetails
ProjectCastle Peak Power Station, Hong Kong
MaterialsPMA
Project area20,000 m²
Fire-design requirements1.5 h, 2.0 h

Specify for a comparable project

Confirm member geometry, corrosion primer, dry-film thickness, exposure and acceptance criteria. Project fire durations are not universal standalone coating ratings.