ZG-03DB-1
Wood finishes and components

ZG-03DB-1 Air-drying transparent wood putty

A transparent putty in the wood-finishing range for discussing filling requirements beneath clear finishes that retain the wood grain.

A transparent putty in the wood-finishing range for discussing filling requirements beneath clear finishes that retain the wood grain.

木器漆18L系列包装示意 / Wood paint 18 L family pack木器漆18L系列包装示意 / Wood paint 18 L family pack

木器漆18L系列包装示意 / Wood paint 18 L family pack

Material & applications

Why consider this reference

A transparent putty in the wood-finishing range for discussing filling requirements beneath clear finishes that retain the wood grain.

Packaging and image identification

Images show series packaging or application scenes. Confirm model-specific packaging, net weight and labels with the order.

What to include in your inquiry

Include ZG-03DB-1, destination country and city, substrate, intended use, area or quantity, colour/gloss, existing coating system and schedule. Site or sample photographs help define scope and a complete material estimate.

Technical data

CategoryWood finishes and components

Application & system

Selection and system planning

Confirm timber, filling depth and subsequent layers; validate suitability on a sample.

Conditions & precautions

Confirm timber, filling depth and subsequent layers; validate suitability on a sample.

Documents & specification support

How do I check suitability for my project?+

Confirm timber, filling depth and subsequent layers; validate suitability on a sample. Share the substrate and exposure so the system can be checked against a sample and current data.

Does the image show the current supplied pack?+

Images show series packaging or application scenes. Confirm model-specific packaging, net weight and labels with the order.

How can I request pricing and a material estimate?+

Send destination, reference, area, colour and quantity. Estimate the complete system with substrate, number of coats and application allowance, rather than equating theoretical coverage with site consumption.

Specify for your project.

Share the application, substrate, area and performance requirements to discuss a coordinated system.

Contact the factory