TB301 White reflective cool-roof coating
A white reflective finish intended to reduce solar heat absorption at the roof surface, for industrial buildings, warehouses and large roof areas. For heat reflective roof paint projects, discuss the substrate, compatible materials and application conditions with our factory.
Material & applications
White reflective cool-roof finish
TB301 combines white-surface solar reflection, UV-weathering resistance and cleanability for roof and wall heat management. The fluorocarbon-resin/acrylic-emulsion system supports the required reflective finish. Refurbishment starts with existing adhesion, drainage, cracks and details.
PVDF molecular structure
Industrial building application
Industrial facility roof
Technical data
Technical data & packaging
| Property | Requirement / data |
|---|---|
| Density | Approx. 1.3 g/cm³ |
| Weight solids | Approx. 67±2% |
| Volume solids | Approx. 45% |
| VOC | 36 g/L (EN ISO11890-1) |
| Flash point | None |
| Composition | Fluorocarbon resin / acrylic emulsion and pigment |
| Theoretical coverage | 5 m²/kg at 80 μm dry film |
| In-container pot life | No specific limit; use mixed material within 4 h |
| Packaging | 25 kg net; colour to agreed sample |
| Storage | Dry at 20°C, protected from light/water, 12 months |
Application & system
Roof layers and spraying
Prepare the substrate; add compatible waterproofing where required, consider UH-Mortar insulation and finish with TB301. An additional thermal-barrier layer can be selected for the complete design. Confirm each layer's compatibility and thickness. Add water before coating, mix slowly and use within 4 hours with agitation. Confirm the water quantity. Use suitable airless spray equipment and pressure/abrasion-resistant steel-reinforced hose.
Equipment & conditions
| Property | Requirement / data |
|---|---|
| Substrate | Prepared, clean, dry and free from debris |
| Compatibility | Confirm primer and previous-layer compatibility |
| Mixing | Water first, slow mechanical mixing; use within 4 h with agitation |
| Spray | Airless with suitable nozzle and steel-reinforced pressure/abrasion-resistant hose |
| Pump flow | 7–35 L/min |
| Auxiliary air | 0.3–0.4 MPa; 0.4 m³/min |
| Recoat | Minimum 16 h; check surface after extended intervals |
| Conditions | 5–40°C; avoid wind/rain and protect during drying |
White cool-roof build-up
Drying & curing
Drying and next operation
Surface dry approximately 3 hours; minimum recoat interval 16 hours. Plan through-drying and return to service around actual film condition, thickness and environmental conditions.
Conditions & precautions
Weather, storage and performance
Apply at 5–40°C, avoiding wind and rain; protect during drying. Packaging: 25 kg. Store dry at 20°C away from light and water for 12 months. Confirm colour and gloss against the agreed sample. Building construction, insulation, climate, air-conditioning use and surface maintenance determine energy performance; no universal saving percentage is implied.
Documents & specification support
Specify for your project.
Share the application, substrate, area and performance requirements to discuss a coordinated system.