TB201 Hollow-microsphere thermal-barrier finish
A hollow-microsphere thermal-barrier finish for coloured roofs and walls, used as a surface layer within a coordinated thermal-management system. For thermal barrier coating projects, discuss the substrate, compatible materials and application conditions with our factory.
Material & applications
Hollow-microsphere thermal barrier
TB201 uses hollow microspheres in a finish for coloured roofs and walls. It coordinates surface appearance with heat management. Applications include interior and exterior buildings and industrial facilities where a non-white finish is required.
Hollow-microsphere structure
Building-surface application
Technical data
Technical data & packaging
| Property | Requirement / data |
|---|---|
| Density | Approx. 0.6 g/cm³ |
| Weight solids | Approx. 67±2% |
| Volume solids | Approx. 85% |
| VOC | 36 g/L (EN ISO11890-1) |
| Flash point | None |
| Theoretical coverage | 5 m²/kg at 80 μm dry film |
| In-container pot life | No specific limit; use mixed material within the 4 h application window |
| Packaging | 25 kg net |
| Storage | 12 months at 20°C, dry and protected from light/water |
Application & system
Layer build-up and application
Prepare the substrate, select a waterproofing layer where needed, consider UH-Mortar as an insulating layer, and finish with TB201. Product identities and layer thicknesses require compatibility review. Clean and dry the surface, check the primer, add water before material and mix at low speed. Use within 4 hours with agitation. Confirm the water quantity. Airless spray uses a suitable nozzle and pressure/abrasion-resistant steel-reinforced hose.
Equipment & conditions
| Property | Requirement / data |
|---|---|
| Substrate | Prepared, clean, dry and free from debris |
| Compatibility | Confirm primer and previous-layer compatibility |
| Mixing | Water first, slow mechanical mixing; use within 4 h with agitation |
| Spray | Airless with suitable nozzle and steel-reinforced pressure/abrasion-resistant hose |
| Pump flow | 7–35 L/min |
| Auxiliary air | 0.3–0.4 MPa; 0.4 m³/min |
| Recoat | Minimum 16 h; check surface after extended intervals |
| Conditions | 5–40°C; avoid wind/rain and protect during drying |
Roof layer build-up
Drying & curing
Drying and sequence
Surface dry approximately 3 hours; minimum recoat interval 16 hours. Through-drying and return to service depend on film thickness, temperature, humidity and system requirements; surface drying alone is insufficient.
Conditions & precautions
Conditions and coverage
Apply at 5–40°C, avoiding wind and rain, and protect while drying. Store sealed at 20°C in dry, dark conditions for 12 months. The theoretical coverage of 5 m²/kg applies at 80 μm dry-film thickness, before substrate effects and site losses. Heat-management performance depends on the building and full layer design.
Documents & specification support
Specify for your project.
Share the application, substrate, area and performance requirements to discuss a coordinated system.
