TB201
Thermal-barrier finishes

TB201 Hollow-microsphere thermal-barrier finish

A hollow-microsphere thermal-barrier finish for coloured roofs and walls, used as a surface layer within a coordinated thermal-management system. For thermal barrier coating projects, discuss the substrate, compatible materials and application conditions with our factory.

TB201中庭屋顶

TB201中庭屋顶

Material & applications

Hollow-microsphere thermal barrier

TB201 uses hollow microspheres in a finish for coloured roofs and walls. It coordinates surface appearance with heat management. Applications include interior and exterior buildings and industrial facilities where a non-white finish is required.

Hollow-microsphere structure

Hollow-microsphere structure

Hollow-microsphere structure

Building-surface application

Building-surface application

Building-surface application

Technical data

Technical data & packaging

PropertyRequirement / data
DensityApprox. 0.6 g/cm³
Weight solidsApprox. 67±2%
Volume solidsApprox. 85%
VOC36 g/L (EN ISO11890-1)
Flash pointNone
Theoretical coverage5 m²/kg at 80 μm dry film
In-container pot lifeNo specific limit; use mixed material within the 4 h application window
Packaging25 kg net
Storage12 months at 20°C, dry and protected from light/water

Application & system

Layer build-up and application

Prepare the substrate, select a waterproofing layer where needed, consider UH-Mortar as an insulating layer, and finish with TB201. Product identities and layer thicknesses require compatibility review. Clean and dry the surface, check the primer, add water before material and mix at low speed. Use within 4 hours with agitation. Confirm the water quantity. Airless spray uses a suitable nozzle and pressure/abrasion-resistant steel-reinforced hose.

Equipment & conditions

PropertyRequirement / data
SubstratePrepared, clean, dry and free from debris
CompatibilityConfirm primer and previous-layer compatibility
MixingWater first, slow mechanical mixing; use within 4 h with agitation
SprayAirless with suitable nozzle and steel-reinforced pressure/abrasion-resistant hose
Pump flow7–35 L/min
Auxiliary air0.3–0.4 MPa; 0.4 m³/min
RecoatMinimum 16 h; check surface after extended intervals
Conditions5–40°C; avoid wind/rain and protect during drying

Roof layer build-up

Roof layer build-up

Roof layer build-up

Drying & curing

Drying and sequence

Surface dry approximately 3 hours; minimum recoat interval 16 hours. Through-drying and return to service depend on film thickness, temperature, humidity and system requirements; surface drying alone is insufficient.

Conditions & precautions

Conditions and coverage

Apply at 5–40°C, avoiding wind and rain, and protect while drying. Store sealed at 20°C in dry, dark conditions for 12 months. The theoretical coverage of 5 m²/kg applies at 80 μm dry-film thickness, before substrate effects and site losses. Heat-management performance depends on the building and full layer design.

Documents & specification support

Specify for your project.

Share the application, substrate, area and performance requirements to discuss a coordinated system.

Contact the factory