KL2001 Water-in-water multicolour stone-effect coating
A water-in-water multicolour coating for relatively smooth granite patterns, with colour composition selected through sample panels.
A water-in-water multicolour coating for relatively smooth granite patterns, with colour composition selected through sample panels.
Material & applications
Why consider this reference
A water-in-water multicolour coating for relatively smooth granite patterns, with colour composition selected through sample panels.
Packaging and image identification
Images show series packaging or application scenes. Confirm model-specific packaging, net weight and labels with the order.
What to include in your inquiry
Include KL2001, destination country and city, substrate, intended use, area or quantity, colour/gloss, existing coating system and schedule. Site or sample photographs help define scope and a complete material estimate.
Technical data
| Category | Exterior coatings |
|---|---|
| Reference main-coat consumption | 0.2-0.9 kg/m² Varies with texture/granules, substrate and method; excludes full-system materials and site allowance. Verify by sample. |
Application & system
Selection and system planning
Different from the sandy KL2002 system; sample spray settings, colour flecks and base colour together.
Conditions & precautions
Different from the sandy KL2002 system; sample spray settings, colour flecks and base colour together.
Documents & specification support
How do I check suitability for my project?+
Different from the sandy KL2002 system; sample spray settings, colour flecks and base colour together. Share the substrate and exposure so the system can be checked against a sample and current data.
Does the image show the current supplied pack?+
Images show series packaging or application scenes. Confirm model-specific packaging, net weight and labels with the order.
How can I request pricing and a material estimate?+
Send destination, reference, area, colour and quantity. Estimate the complete system with substrate, number of coats and application allowance, rather than equating theoretical coverage with site consumption.
Specify for your project.
Share the application, substrate, area and performance requirements to discuss a coordinated system.
